Development
Valhall developments year by year
The Valhall field centre was completely modernised during the 2000s. This partly represented a response to seabed subsidence on the field, with new platforms installed on its flanks. The installations were connected to the electricity grid on land, making them much more environment-friendly. And a permanent seismic array was installed on the seabed to improve reservoir surveillance. Last but not least, a control room established at BP’s offices in Forus outside Stavanger made it possible to monitor all aspects of production and processing much more effectively than before.