Tekniske tegninger og dokumentasjon for plattformene på Valhall
Her finner du utvalgte tekniske tegninger og teknisk dokumentasjon for plattformene på Valhallfeltet.

Boreplattformen DP
- Drilling Modules & Substructure West Elevations
- General Arrangement Process Unit
- General Arrangement Process Unit 2
- HVAC Plantroom Layout (Diesel Layout)
- Layout for kjellerdekk (Cellar Deck) på DP
- Master Control Centre (LER) Mud Slurryfication Unit
- Master Equipment List DP
- Mud Module General Layout of Lower Deck
- Mud Module General Layout of Mezzanine Floor
- Mud Module General Layout of Roof
- Mud Modules Sections A-A, B-B & C-C
- Plot Plan East Elevation DP
- Plot Plan North Elevation DP
- Plot Plan West Elevation DP
Produksjonsplattformen PCP
- Arrangement – Adkomst plattform i nordfasade mellomdekk PSV-ventil
- Flare Boom Access Platform Extension General Arrangement and Details
- Jacket on Skirt Pile Sleeve
- Jacket-elevations on Rows 1 & 4
Boligplattformen QP
Stigerørsplattformen RP
- Jacket Static in Place Analysis Elevation on Line A
- North Elevation on Connection Bridge, Ekofisk Tank & RP
- Riser Platform East Elevation
- Riser Platform South Elevation
- Riser Platform West Elevation
Hod-plattformen
- Area Classification Layout Elevation Looking North
- Area Classification Layout Elevation Looking West
- Plot Plan Elevation Looking North
- Plot Plan Elevation Looking West
- Structural – Topsides Elevation On Row 1
- Structural – Topsides Isometric
- Structural – Topsides Plan on Cellar Deck
- Structural – Topsides Plan on Main Deck
- Hod Field Development and Operating Plan, Volume 1 Text, 1-4
- Hod Field Development and Operating Plan, Volume 1 Text, 5-8
- Hod Field Development and Operating Plan, Volume 2 Exhibits, 1-3
- Hod Field Development and Operating Plan, Volume 2 Exhibits, 3-4
- Hod Field Development and Operating Plan, Volume 2 Exhibits, 5
- Hod Field Development and Operating Plan, Volume 2 Exhibits, 5-7
- Hod Field Development and Operating Plan, Appendix, Consequence Analysis
- Hod Field Development and Operating Plan, Supplement
Brønnhodeplattformen WP
- Hose Reel Station Valhall WP & IP
- Instrument Layout Equipment Deck
- Isometric View without Main Deck
- Manual, Temperature Elements and Thermowells
- Manual, Turbine Meters
- Master Equipment List Valhall EQM
- Master Equipment List Valhall WP
- Module Area Classification Main Deck
- Piping Plan Main Deck
- Plot Plan Elevation Looking East
- Plot Plan Elevation Looking North
- Plot Plan Elevation Looking South
- Plot Plan Elevation Looking West
- Plot Plan Main Deck
- Plot Plan Mezzanine Deck
- Plot Plan Sub-cellar Deck
- Weight Calculation
- WP Well Slots
Injeksjonsplatformen IP
- Plot Plan D10,D20 West Elevation
- Plot Plan Elevation Looking East
- Plot Plan Elevation Looking North
- Plot Plan Elevation Looking South-West
- Plot Plan Elevation Looking West
- Plot Plan Isometric View Looking North-East
- Plot Plan Isometric View Looking South-West
- Valhall Derrick General Arrangement Elevations
- Valhall Water Injection Jacket General Arrangement Elevations Row A
- Valhall Water Injection Jacket General Arrangement Plan EL. +15.000
Valhall Flanke Nord (VFN)
- Valhall Flank Development Project Subsea Flowline Design Basis
- Valhall North Flank Piping Fabrication Isometric
- VFN Plot Plan Cellar Deck Plan View EL. 23.500
- VFN Plot Plan Heli Deck Plan View EL. 43.000
- VFN Plot Plan Main Deck Plan View EL. 34.000
- VFN Plot Plan Mezzanine Deck Plan View EL. 27.500
- VFN Plot Plan Section Looking East
- VFN Plot Plan Section Looking North
Valhall Flanke Sør (VFS)
- Fire & Gas Layout Cellar Deck EL. +23.500
- Hazardous Area Classification Main Deck Plan View EL. 34.000
- Hazardous Area Classification Mezzanine Deck Plan View EL. 27.500
- VFS Gas Lift Module Main Structure
- VFS Plot Plan Cellar Deck Plan View EL. 23.500
- VFS Plot Plan Heli Deck Plan View EL. 43.000
- VFS Plot Plan Main Deck Plan View EL. 34.000
- VFS Plot Plan Mezzanine Deck EL. 27.500
- VFS Plot Plan Section Looking East
- VFS Plot Plan Section Looking North
Prosess- og boligplattformen PH
- Emergency LER GA Layout
- Living Quarters 1 Person Cabin
- Living Quarters East Elevation
- Living Quarters North Elevation
- Living Quarters South Elevation
- Living Quarters West Elevation
- Living Quarters GA Layout Level 1
- Living Quarters GA Layout Level 2
- Living Quarters GA Layout Level 3
- Living Quarters GA Layout Level 4
- Living Quarters GA Layout Level 8
- Living Quarters Room Layout Level 2 208 Town Hall
- Living Quarters Room Layout Level 7 L713 Office
- Piping Hook-up Spool
- Power from Shore Module GA Layout Level 1
- Power from Shore Module GA Layout Level 2 & 3Power from Shore Module GA Layout Part Level 4 & Level 2
- Power from Shore Module GA Layout Roof Level
- Power from Shore Module North Elevation
- Power from Shore Module South Elevation
- Power from Shore Module West Elevation
- Power from Shore Module North Utility Station
- Power from Shore Module Piping General Arrangement AHU Area Upper Level Plan EL. +75.772 T.O.S.
- Power from Shore Module Piping General Arrangement Cantilever Area Plan EL +73.267 T.O.S.
- Power from Shore Module Piping General Arrangement Cantilever Area View Looking North
- Power from Shore Module Piping General Arrangement Cantilever Area View Looking South